Upstream stations:
Downstream station:SHEF ID: CHRK1 BIG HILL C NR CHERRYVALE, KS STATION TYPE: Regulating: Stage = 15.00, Flow = 1525 PRECIP STAGE RIV-FLOW BAT-LOAD in ft cfs volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/06 00:00 0.00 3.00 5 12.77 08/06 01:00 0.00 2.99 5 12.77 08/06 02:00 0.00 2.99 5 12.71 08/06 03:00 0.00 2.98 4 12.71 08/06 04:00 0.01 2.98 4 12.71 08/06 05:00 0.00 2.97 4 12.65 08/06 06:00 0.00 2.97 4 12.65 08/06 07:00 0.00 2.96 4 12.65 08/06 08:00 0.00 2.96 4 12.71 08/06 09:00 0.01 2.96 4 13.30 08/06 10:00 0.00 2.96 4 13.48 08/06 11:00 0.00 2.95 4 13.77 08/06 12:00 0.00 2.95 4 13.88 08/06 13:00 0.00 2.95 4 13.65 08/06 14:00 0.00 2.95 4 13.53 08/06 15:00 0.00 2.95 4 13.94 08/06 16:00 0.00 2.95 4 13.59 08/06 17:00 0.00 2.95 4 13.07 08/06 18:00 0.00 2.95 4 13.07 08/06 19:00 0.00 2.95 4 13.00 08/06 20:00 0.00 2.95 4 12.95 08/06 21:00 0.00 2.95 4 12.89 08/06 22:00 0.00 2.94 3 12.83 08/06 23:00 0.00 2.93 3 12.83