Upstream stations:
Downstream station:SHEF ID: CHRK1 BIG HILL C NR CHERRYVALE, KS STATION TYPE: Regulating: Stage = 15.00, Flow = 1525 PRECIP STAGE RIV-FLOW BAT-LOAD in ft cfs volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 06/28 00:00 0.00 5.01 106 12.83 06/28 01:00 0.00 4.99 104 12.77 06/28 02:00 0.00 4.97 103 12.77 06/28 03:00 0.00 4.95 101 12.77 06/28 04:00 0.00 4.93 99 12.71 06/28 05:00 0.00 4.91 98 12.71 06/28 06:00 0.02 4.90 97 12.71 06/28 07:00 0.04 4.89 96 12.65 06/28 08:00 0.01 4.88 95 12.71 06/28 09:00 0.00 4.86 94 12.89 06/28 10:00 0.00 4.84 92 13.12 06/28 11:00 0.01 4.83 92 13.36 06/28 12:00 0.00 4.82 91 13.53 06/28 13:00 0.00 4.81 90 13.30 06/28 14:00 0.04 4.80 89 13.18 06/28 15:00 0.02 4.80 89 13.12 06/28 16:00 0.00 4.80 89 13.12 06/28 17:00 0.00 4.79 89 13.12 06/28 18:00 0.01 4.79 89 13.00 06/28 19:00 0.04 4.85 93 12.89 06/28 20:00 0.04 4.93 99 12.89 06/28 21:00 0.04 5.02 107 12.83 06/28 22:00 0.03 5.12 115 12.83 06/28 23:00 ---- ---- ---- ----