Upstream stations:
Downstream station:
SHEF ID: CHRK1 BIG HILL C NR CHERRYVALE, KS
STATION TYPE:
Regulating: Stage = 15.00, Flow = 1525
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
05/15 00:00 0.00 2.95 4 12.71
05/15 01:00 0.00 2.95 4 12.71
05/15 02:00 0.00 2.94 3 12.65
05/15 03:00 0.00 2.94 3 12.65
05/15 04:00 0.00 2.94 3 12.65
05/15 05:00 0.00 2.94 3 12.60
05/15 06:00 0.01 2.94 3 12.60
05/15 07:00 0.05 2.94 3 12.60
05/15 08:00 0.05 2.95 4 12.60
05/15 09:00 0.01 2.95 4 12.77
05/15 10:00 0.00 2.95 4 13.30
05/15 11:00 0.00 2.95 4 13.24
05/15 12:00 0.00 2.95 4 13.59
05/15 13:00 0.00 2.95 4 13.53
05/15 14:00 0.00 2.95 4 13.53
05/15 15:00 0.00 2.94 3 13.30
05/15 16:00 0.00 2.94 3 13.18
05/15 17:00 0.00 2.94 3 13.24
05/15 18:00 0.00 2.94 3 13.12
05/15 19:00 0.00 2.94 3 13.00
05/15 20:00 0.00 2.94 3 12.95
05/15 21:00 0.00 2.94 3 12.89
05/15 22:00 0.00 2.94 3 12.89
05/15 23:00 ---- ---- ---- ----