Upstream stations:
Downstream station:SHEF ID: CHRK1 BIG HILL C NR CHERRYVALE, KS STATION TYPE: Regulating: Stage = 15.00, Flow = 1525 PRECIP STAGE RIV-FLOW BAT-LOAD in ft cfs volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 05/08 00:00 0.00 3.30 14 12.77 05/08 01:00 0.00 3.29 14 12.71 05/08 02:00 0.00 3.28 13 12.71 05/08 03:00 0.00 3.27 13 12.65 05/08 04:00 0.00 3.26 13 12.65 05/08 05:00 0.00 3.26 13 12.65 05/08 06:00 0.00 3.27 13 12.60 05/08 07:00 0.00 3.28 13 12.60 05/08 08:00 0.00 3.29 14 12.71 05/08 09:00 0.00 3.29 14 13.24 05/08 10:00 0.00 3.28 13 13.42 05/08 11:00 0.00 3.27 13 13.83 05/08 12:00 0.00 3.26 13 13.53 05/08 13:00 0.00 3.24 12 14.24 05/08 14:00 0.00 3.22 11 13.83 05/08 15:00 0.00 3.21 11 14.00 05/08 16:00 0.00 3.19 10 14.00 05/08 17:00 0.00 3.18 10 13.18 05/08 18:00 0.00 3.17 10 13.07 05/08 19:00 0.00 3.15 9 13.00 05/08 20:00 0.00 3.14 9 12.95 05/08 21:00 0.00 3.13 8 12.89 05/08 22:00 0.00 3.13 8 12.89 05/08 23:00 0.00 3.13 8 12.83