Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4310
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
06/03 00:00 0.00 3.98 3 12.71
06/03 01:00 0.00 3.98 3 12.71
06/03 02:00 0.00 3.98 3 12.71
06/03 03:00 0.00 3.98 3 12.65
06/03 04:00 0.00 3.98 3 12.65
06/03 05:00 0.00 3.98 3 12.65
06/03 06:00 0.00 3.98 3 12.60
06/03 07:00 0.00 3.98 3 12.60
06/03 08:00 0.00 3.98 3 12.60
06/03 09:00 0.00 3.98 3 13.07
06/03 10:00 0.00 3.98 3 13.77
06/03 11:00 0.00 3.98 3 13.77
06/03 12:00 0.00 3.98 3 13.77
06/03 13:00 0.00 3.98 3 14.06
06/03 14:00 0.00 3.98 3 14.06
06/03 15:00 0.07 3.99 3 13.77
06/03 16:00 0.22 4.00 4 13.30
06/03 17:00 0.15 4.01 4 13.30
06/03 18:00 0.18 4.02 4 12.83
06/03 19:00 0.08 4.02 4 12.83
06/03 20:00 0.00 4.02 4 12.77
06/03 21:00 0.00 4.02 4 12.77
06/03 22:00 0.00 4.02 4 12.71
06/03 23:00 0.00 4.02 4 12.71