Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4294
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
05/26 00:00 0.06 13.00 4294 12.71
05/26 01:00 0.02 13.44 4615 12.71
05/26 02:00 0.04 13.46 4630 12.71
05/26 03:00 0.03 13.06 4337 12.71
05/26 04:00 0.00 12.27 3785 12.71
05/26 05:00 0.01 11.35 3185 12.71
05/26 06:00 0.00 10.38 2603 12.71
05/26 07:00 0.02 9.57 2159 12.65
05/26 08:00 0.00 8.94 1839 12.71
05/26 09:00 0.00 8.44 1601 12.83
05/26 10:00 0.00 8.10 1448 12.95
05/26 11:00 0.00 7.79 1315 13.18
05/26 12:00 ---- 7.52 1204 ----
05/26 13:00 ---- 7.27 1101 13.36
05/26 14:00 0.00 7.07 1011 13.48
05/26 15:00 0.00 6.86 901 13.65
05/26 16:00 0.00 6.70 810 13.53
05/26 17:00 0.00 6.53 714 13.36
05/26 18:00 0.00 6.38 634 13.65
05/26 19:00 0.00 6.27 579 13.12
05/26 20:00 0.00 6.15 523 13.00
05/26 21:00 0.00 6.05 478 12.95
05/26 22:00 0.00 5.96 440 12.89
05/26 23:00 0.00 5.90 416 12.89