Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4294
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
05/14 00:00 0.00 4.71 74 12.89
05/14 01:00 0.00 4.71 74 12.89
05/14 02:00 0.00 4.71 74 12.83
05/14 03:00 0.00 4.71 74 12.83
05/14 04:00 0.00 4.71 74 12.83
05/14 05:00 0.00 4.71 74 12.83
05/14 06:00 0.00 4.71 74 12.77
05/14 07:00 0.00 4.71 74 12.77
05/14 08:00 0.00 4.70 72 12.83
05/14 09:00 0.00 4.70 72 13.12
05/14 10:00 0.00 4.70 72 13.77
05/14 11:00 0.00 4.70 72 13.59
05/14 12:00 0.00 4.70 72 13.53
05/14 13:00 0.00 4.70 72 13.12
05/14 14:00 0.00 4.70 72 13.07
05/14 15:00 0.00 4.70 72 13.07
05/14 16:00 0.00 4.69 70 13.00
05/14 17:00 0.00 4.70 72 13.00
05/14 18:00 0.00 4.69 70 12.95
05/14 19:00 0.00 4.69 70 13.00
05/14 20:00 0.00 4.69 70 12.95
05/14 21:00 0.00 4.69 70 12.89
05/14 22:00 0.00 4.68 69 12.89
05/14 23:00 0.00 4.68 69 12.89