Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
02/05 00:00 0.00 4.19 10 12.77
02/05 01:00 0.00 4.19 10 12.71
02/05 02:00 0.00 4.19 10 12.71
02/05 03:00 0.00 4.19 10 12.71
02/05 04:00 0.00 4.19 10 12.65
02/05 05:00 0.00 4.19 10 12.60
02/05 06:00 0.00 4.19 10 12.60
02/05 07:00 0.00 4.19 10 12.60
02/05 08:00 0.00 4.19 10 12.60
02/05 09:00 0.00 4.19 10 12.71
02/05 10:00 0.00 4.19 10 14.41
02/05 11:00 0.00 4.19 10 14.47
02/05 12:00 0.00 4.20 11 14.41
02/05 13:00 0.00 4.19 10 13.88
02/05 14:00 0.00 4.20 11 13.94
02/05 15:00 0.00 4.20 11 13.88
02/05 16:00 0.00 4.20 11 13.83
02/05 17:00 0.00 4.20 11 13.77
02/05 18:00 0.00 4.20 11 13.24
02/05 19:00 0.00 4.20 11 13.07
02/05 20:00 0.00 4.20 11 13.00
02/05 21:00 0.00 4.20 11 12.95
02/05 22:00 0.00 4.20 11 12.89
02/05 23:00 0.00 4.20 11 12.89