Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
01/25 00:00 0.00 4.22 12 12.89
01/25 01:00 0.00 4.22 12 12.83
01/25 02:00 0.00 4.22 12 12.83
01/25 03:00 0.00 4.22 12 12.77
01/25 04:00 0.00 4.22 12 12.71
01/25 05:00 0.00 4.22 12 12.71
01/25 06:00 0.00 4.22 12 12.65
01/25 07:00 0.00 4.22 12 12.65
01/25 08:00 0.00 4.22 12 12.65
01/25 09:00 0.00 4.22 12 12.71
01/25 10:00 0.00 4.22 12 14.12
01/25 11:00 0.00 4.22 12 14.41
01/25 12:00 0.00 4.21 12 14.41
01/25 13:00 0.00 4.20 11 14.30
01/25 14:00 0.00 4.21 12 14.18
01/25 15:00 0.00 4.21 12 14.18
01/25 16:00 0.00 4.22 12 14.00
01/25 17:00 0.00 4.22 12 13.94
01/25 18:00 0.00 4.22 12 13.36
01/25 19:00 0.00 4.21 12 13.00
01/25 20:00 0.00 4.21 12 12.89
01/25 21:00 0.00 4.21 12 12.83
01/25 22:00 0.00 4.21 12 12.83
01/25 23:00 0.00 4.21 12 12.77