Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
01/21 00:00 0.00 4.18 10 12.65
01/21 01:00 0.00 4.18 10 12.65
01/21 02:00 0.00 4.18 10 12.60
01/21 03:00 0.00 4.18 10 12.60
01/21 04:00 0.00 4.19 11 12.48
01/21 05:00 0.00 4.19 11 12.54
01/21 06:00 0.00 4.19 11 12.54
01/21 07:00 0.00 4.19 11 12.54
01/21 08:00 0.00 4.19 11 12.54
01/21 09:00 0.00 4.19 11 12.65
01/21 10:00 0.00 4.19 11 14.00
01/21 11:00 0.00 4.20 11 14.53
01/21 12:00 0.00 4.20 11 14.53
01/21 13:00 0.00 4.20 11 14.06
01/21 14:00 0.00 4.19 11 14.00
01/21 15:00 0.00 4.20 11 13.94
01/21 16:00 0.00 4.20 11 13.83
01/21 17:00 0.00 4.20 11 13.53
01/21 18:00 0.00 4.19 11 13.12
01/21 19:00 0.00 4.20 11 13.00
01/21 20:00 0.00 4.20 11 12.89
01/21 21:00 0.00 4.20 11 12.89
01/21 22:00 0.00 4.20 11 12.89
01/21 23:00 0.00 4.20 11 12.83