Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
12/29 00:00 0.00 4.27 15 12.89
12/29 01:00 0.00 4.26 14 12.89
12/29 02:00 0.00 4.27 15 12.83
12/29 03:00 0.00 4.26 14 12.83
12/29 04:00 0.00 4.27 15 12.77
12/29 05:00 0.00 4.26 14 12.77
12/29 06:00 0.00 4.26 14 12.77
12/29 07:00 0.00 4.26 14 12.77
12/29 08:00 0.00 4.26 14 12.77
12/29 09:00 0.00 4.26 14 12.77
12/29 10:00 0.00 4.27 15 12.89
12/29 11:00 0.00 4.27 15 13.12
12/29 12:00 0.00 4.27 15 13.65
12/29 13:00 0.00 4.27 15 13.83
12/29 14:00 0.00 4.27 15 14.47
12/29 15:00 0.00 4.27 15 14.35
12/29 16:00 0.00 4.27 15 14.24
12/29 17:00 0.00 4.27 15 13.59
12/29 18:00 0.00 4.27 15 13.07
12/29 19:00 0.00 4.27 15 13.00
12/29 20:00 0.00 4.27 15 12.95
12/29 21:00 0.00 4.27 15 12.89
12/29 22:00 0.00 4.26 14 12.89
12/29 23:00 0.00 4.26 14 12.83