Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
11/17 00:00 0.00 4.46 27 13.00
11/17 01:00 0.00 4.46 27 12.95
11/17 02:00 0.00 4.46 27 12.89
11/17 03:00 0.00 4.46 27 12.89
11/17 04:00 0.00 4.47 28 12.89
11/17 05:00 0.00 4.47 28 12.89
11/17 06:00 0.00 4.47 28 12.83
11/17 07:00 0.00 4.47 28 12.77
11/17 08:00 0.00 4.48 29 12.83
11/17 09:00 0.00 4.48 29 12.89
11/17 10:00 0.00 4.48 29 13.24
11/17 11:00 0.00 4.47 28 13.83
11/17 12:00 0.00 4.48 29 13.88
11/17 13:00 0.00 4.47 28 14.24
11/17 14:00 0.00 4.47 28 14.18
11/17 15:00 0.00 4.47 28 13.71
11/17 16:00 0.00 4.47 28 13.65
11/17 17:00 0.00 4.47 28 13.42
11/17 18:00 0.00 4.47 28 13.07
11/17 19:00 0.00 4.46 27 13.00
11/17 20:00 0.00 4.46 27 12.95
11/17 21:00 0.00 4.46 27 12.95
11/17 22:00 0.00 4.46 27 12.89
11/17 23:00 0.00 4.46 27 12.83