Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 3994
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
11/03 00:00 0.00 4.53 37 12.83
11/03 01:00 0.00 4.53 37 12.77
11/03 02:00 0.00 4.53 37 12.71
11/03 03:00 0.00 4.53 37 12.71
11/03 04:00 0.00 4.53 37 12.71
11/03 05:00 0.00 4.53 37 12.71
11/03 06:00 0.00 4.53 37 12.71
11/03 07:00 0.00 4.53 37 12.65
11/03 08:00 0.00 4.53 37 12.65
11/03 09:00 0.00 4.53 37 12.65
11/03 10:00 0.00 4.53 37 12.77
11/03 11:00 0.00 4.53 37 13.12
11/03 12:00 0.00 4.52 37 13.59
11/03 13:00 0.00 4.53 37 13.59
11/03 14:00 0.00 4.52 37 13.53
11/03 15:00 0.00 4.52 37 13.36
11/03 16:00 0.00 4.52 37 13.30
11/03 17:00 0.00 4.52 37 13.36
11/03 18:00 0.00 4.52 37 13.12
11/03 19:00 0.00 4.52 37 13.00
11/03 20:00 0.00 4.52 37 12.89
11/03 21:00 0.00 4.52 37 12.89
11/03 22:00 0.00 4.51 36 12.83
11/03 23:00 0.00 4.51 36 12.71