Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS STATION TYPE: Regulating: Stage = 13.00, Flow = 3994 PRECIP STAGE RIV-FLOW BAT-LOAD in ft cfs volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 11/03 00:00 0.00 4.53 37 12.83 11/03 01:00 0.00 4.53 37 12.77 11/03 02:00 0.00 4.53 37 12.71 11/03 03:00 0.00 4.53 37 12.71 11/03 04:00 0.00 4.53 37 12.71 11/03 05:00 0.00 4.53 37 12.71 11/03 06:00 0.00 4.53 37 12.71 11/03 07:00 0.00 4.53 37 12.65 11/03 08:00 0.00 4.53 37 12.65 11/03 09:00 0.00 4.53 37 12.65 11/03 10:00 0.00 4.53 37 12.77 11/03 11:00 0.00 4.53 37 13.12 11/03 12:00 0.00 4.52 37 13.59 11/03 13:00 0.00 4.53 37 13.59 11/03 14:00 0.00 4.52 37 13.53 11/03 15:00 0.00 4.52 37 13.36 11/03 16:00 0.00 4.52 37 13.30 11/03 17:00 0.00 4.52 37 13.36 11/03 18:00 0.00 4.52 37 13.12 11/03 19:00 0.00 4.52 37 13.00 11/03 20:00 0.00 4.52 37 12.89 11/03 21:00 0.00 4.52 37 12.89 11/03 22:00 0.00 4.51 36 12.83 11/03 23:00 0.00 4.51 36 12.71