Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 3994
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
10/18 00:00 0.00 4.43 29 12.83
10/18 01:00 0.00 4.43 29 12.77
10/18 02:00 0.00 4.43 29 12.77
10/18 03:00 0.00 4.43 29 12.77
10/18 04:00 0.00 4.43 29 12.77
10/18 05:00 0.00 4.43 29 12.71
10/18 06:00 0.00 4.43 29 12.71
10/18 07:00 0.00 4.42 28 12.71
10/18 08:00 0.00 4.42 28 12.71
10/18 09:00 0.00 4.42 28 12.71
10/18 10:00 0.00 4.43 29 13.36
10/18 11:00 0.00 4.43 29 14.12
10/18 12:00 0.00 4.43 29 14.00
10/18 13:00 0.00 4.43 29 13.42
10/18 14:00 0.00 4.43 29 13.42
10/18 15:00 0.00 4.43 29 13.36
10/18 16:00 0.00 4.43 29 13.36
10/18 17:00 0.00 4.43 29 13.36
10/18 18:00 0.00 4.43 29 13.12
10/18 19:00 0.00 4.42 28 13.07
10/18 20:00 0.00 4.42 28 13.00
10/18 21:00 0.00 4.42 28 13.00
10/18 22:00 0.00 4.42 28 12.89
10/18 23:00 0.00 4.41 27 12.95