Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 3994
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
10/02 00:00 0.00 4.26 17 12.89
10/02 01:00 0.00 4.26 17 12.89
10/02 02:00 0.00 4.26 17 12.89
10/02 03:00 0.00 4.26 17 12.89
10/02 04:00 0.00 4.26 17 12.83
10/02 05:00 0.00 4.26 17 12.83
10/02 06:00 0.00 4.26 17 12.83
10/02 07:00 0.00 4.26 17 12.77
10/02 08:00 0.00 4.26 17 12.77
10/02 09:00 0.00 4.26 17 13.00
10/02 10:00 0.00 4.26 17 13.59
10/02 11:00 0.00 4.26 17 13.24
10/02 12:00 0.02 4.26 17 13.12
10/02 13:00 0.01 4.26 17 13.12
10/02 14:00 0.01 4.26 17 13.48
10/02 15:00 0.00 4.26 17 13.24
10/02 16:00 0.01 4.26 17 13.30
10/02 17:00 0.00 4.26 17 13.36
10/02 18:00 0.00 4.26 17 13.12
10/02 19:00 0.00 4.26 17 13.00
10/02 20:00 0.00 4.26 17 12.95
10/02 21:00 0.00 4.26 17 12.89
10/02 22:00 0.00 4.25 16 12.89
10/02 23:00 0.00 4.25 16 12.89