Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 3994
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
09/21 00:00 0.00 4.28 18 12.77
09/21 01:00 0.00 4.28 18 12.77
09/21 02:00 0.00 4.28 18 12.77
09/21 03:00 0.00 4.27 18 12.71
09/21 04:00 0.00 4.28 18 12.65
09/21 05:00 0.00 4.28 18 12.71
09/21 06:00 0.00 4.28 18 12.71
09/21 07:00 0.00 4.27 18 12.71
09/21 08:00 0.00 4.27 18 12.71
09/21 09:00 0.00 4.27 18 12.71
09/21 10:00 0.00 4.27 18 13.30
09/21 11:00 0.00 4.27 18 13.65
09/21 12:00 0.00 4.27 18 13.59
09/21 13:00 0.00 4.28 18 13.65
09/21 14:00 0.00 4.27 18 13.30
09/21 15:00 0.00 4.27 18 13.53
09/21 16:00 0.00 4.27 18 13.48
09/21 17:00 0.00 4.27 18 13.30
09/21 18:00 0.00 4.27 18 13.36
09/21 19:00 0.00 4.27 18 13.00
09/21 20:00 0.00 4.26 17 12.89
09/21 21:00 0.00 4.26 17 12.89
09/21 22:00 0.00 4.26 17 12.89
09/21 23:00 0.00 4.27 18 12.89