Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4031
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
09/13 00:00 ---- 4.34 31 ----
09/13 01:00 ---- 4.34 31 ----
09/13 02:00 ---- 4.34 31 ----
09/13 03:00 ---- 4.34 31 ----
09/13 04:00 ---- 4.34 31 ----
09/13 05:00 ---- 4.33 31 ----
09/13 06:00 ---- 4.33 31 ----
09/13 07:00 ---- 4.33 31 ----
09/13 08:00 ---- 4.33 30 ----
09/13 09:00 ---- 4.33 30 11.25
09/13 10:00 0.00 4.33 30 11.72
09/13 11:00 0.00 4.32 30 12.19
09/13 12:00 0.00 4.33 30 12.54
09/13 13:00 0.00 4.33 30 12.71
09/13 14:00 0.00 4.33 30 12.65
09/13 15:00 0.00 4.34 31 12.60
09/13 16:00 0.00 4.33 30 12.54
09/13 17:00 0.00 4.33 30 12.42
09/13 18:00 0.00 4.33 30 12.13
09/13 19:00 0.00 4.33 30 11.48
09/13 20:00 0.00 4.33 30 11.37
09/13 21:00 0.00 4.33 30 ----
09/13 22:00 ---- 4.33 30 ----
09/13 23:00 ---- ---- ---- ----