Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
05/17 00:00 0.00 4.44 34 12.30
05/17 01:00 0.00 4.48 37 12.30
05/17 02:00 0.00 4.53 42 12.24
05/17 03:00 0.00 4.55 44 12.24
05/17 04:00 0.00 4.56 46 12.24
05/17 05:00 0.00 4.56 46 12.24
05/17 06:00 0.00 4.55 44 12.24
05/17 07:00 0.00 4.54 43 12.24
05/17 08:00 0.00 4.53 42 12.24
05/17 09:00 0.00 4.52 41 12.30
05/17 10:00 0.00 4.50 39 12.54
05/17 11:00 0.00 4.50 39 12.54
05/17 12:00 ---- ---- ---- ----
05/17 13:00 ---- 4.48 37 13.00
05/17 14:00 0.00 4.47 37 13.36
05/17 15:00 0.00 4.46 36 13.59
05/17 16:00 0.00 4.45 35 13.36
05/17 17:00 0.00 4.44 34 13.48
05/17 18:00 0.00 4.44 34 12.89
05/17 19:00 0.00 4.43 33 12.89
05/17 20:00 0.00 4.42 32 12.77
05/17 21:00 0.00 4.42 32 12.48
05/17 22:00 0.00 4.41 31 12.36
05/17 23:00 0.00 4.41 31 12.36