Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
04/25 00:00 0.00 4.39 30 12.30
04/25 01:00 0.00 4.39 30 12.24
04/25 02:00 0.00 4.39 30 12.24
04/25 03:00 0.00 4.39 30 12.24
04/25 04:00 0.00 4.38 29 12.24
04/25 05:00 0.00 4.39 30 12.24
04/25 06:00 0.00 4.38 29 12.24
04/25 07:00 0.00 4.39 30 12.24
04/25 08:00 0.00 4.38 29 12.42
04/25 09:00 0.00 4.39 30 12.42
04/25 10:00 0.00 4.39 30 13.00
04/25 11:00 0.00 4.39 30 13.59
04/25 12:00 0.00 4.38 29 13.77
04/25 13:00 0.00 4.39 30 13.83
04/25 14:00 0.00 4.39 30 13.77
04/25 15:00 0.00 4.39 30 13.71
04/25 16:00 0.00 4.39 30 13.53
04/25 17:00 0.00 4.39 30 13.53
04/25 18:00 0.00 4.39 30 13.36
04/25 19:00 0.00 4.39 30 12.77
04/25 20:00 0.00 4.38 29 12.54
04/25 21:00 0.00 4.38 29 12.42
04/25 22:00 0.00 4.38 29 12.36
04/25 23:00 0.00 4.38 29 12.24