Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
03/02 00:00 0.00 4.23 11 12.24
03/02 01:00 0.00 4.23 11 12.19
03/02 02:00 0.00 4.23 11 12.13
03/02 03:00 0.00 4.23 11 12.13
03/02 04:00 0.00 4.23 11 12.13
03/02 05:00 0.00 4.23 11 12.13
03/02 06:00 0.00 4.22 11 12.07
03/02 07:00 0.00 4.22 11 12.07
03/02 08:00 0.00 4.23 11 12.07
03/02 09:00 0.00 4.23 11 12.89
03/02 10:00 0.00 4.23 11 13.59
03/02 11:00 0.00 4.23 11 14.00
03/02 12:00 0.00 4.23 11 14.00
03/02 13:00 0.00 4.23 11 13.94
03/02 14:00 0.00 4.23 11 13.88
03/02 15:00 0.00 4.23 11 13.83
03/02 16:00 0.00 4.23 11 13.65
03/02 17:00 0.00 4.23 11 13.53
03/02 18:00 0.00 4.23 11 12.77
03/02 19:00 0.00 4.22 11 12.36
03/02 20:00 0.00 4.23 11 12.36
03/02 21:00 0.00 4.23 11 12.36
03/02 22:00 0.00 4.23 11 12.30
03/02 23:00 0.00 4.22 11 12.30