Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
02/14 00:00 0.00 4.28 14 12.24
02/14 01:00 0.00 4.31 15 12.24
02/14 02:00 0.00 4.30 15 12.19
02/14 03:00 0.00 4.31 15 12.19
02/14 04:00 0.00 4.29 14 12.19
02/14 05:00 0.00 4.30 15 12.19
02/14 06:00 0.00 4.29 14 12.19
02/14 07:00 0.00 4.30 15 12.13
02/14 08:00 0.00 4.28 14 12.13
02/14 09:00 0.00 4.28 14 12.19
02/14 10:00 0.00 4.28 14 12.60
02/14 11:00 0.00 4.28 14 12.71
02/14 12:00 0.00 4.30 15 13.07
02/14 13:00 0.00 4.29 14 13.00
02/14 14:00 0.00 4.29 14 12.89
02/14 15:00 0.00 4.29 14 13.18
02/14 16:00 0.00 4.31 15 13.36
02/14 17:00 0.00 4.30 15 13.24
02/14 18:00 0.00 4.29 14 12.60
02/14 19:00 ---- ---- ---- ----
02/14 20:00 ---- 4.28 14 12.42
02/14 21:00 ---- 4.28 14 12.19
02/14 22:00 0.00 4.29 14 12.13
02/14 23:00 ---- ---- ---- ----