Downstream station:
SHEF ID: CDPK1 CEDAR C NR CEDAR POINT, KS
STATION TYPE:
Regulating: Stage = 13.00, Flow = 4281
PRECIP STAGE RIV-FLOW BAT-LOAD
in ft cfs volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(US/Central)
02/08 00:00 0.00 4.34 17 12.01
02/08 01:00 0.00 4.34 17 12.01
02/08 02:00 0.00 4.34 17 ----
02/08 03:00 0.00 4.34 17 12.01
02/08 04:00 0.00 4.34 17 12.01
02/08 05:00 0.00 4.34 17 11.95
02/08 06:00 0.00 4.34 17 11.95
02/08 07:00 0.00 4.33 16 11.95
02/08 08:00 0.00 4.33 16 11.95
02/08 09:00 0.00 4.33 16 11.95
02/08 10:00 0.00 4.33 16 11.95
02/08 11:00 0.00 4.33 16 12.01
02/08 12:00 0.00 4.33 16 12.07
02/08 13:00 0.00 4.33 16 12.13
02/08 14:00 0.00 4.33 16 12.24
02/08 15:00 0.00 4.33 16 12.36
02/08 16:00 0.00 4.33 16 12.42
02/08 17:00 0.00 4.33 16 12.24
02/08 18:00 0.00 4.33 16 12.01
02/08 19:00 0.00 4.33 16 12.01
02/08 20:00 0.00 4.33 16 11.95
02/08 21:00 0.00 4.33 16 11.95
02/08 22:00 0.00 4.33 16 11.95
02/08 23:00 0.00 4.32 16 11.95