BPST2: Bateman Pump Station

                                SHEF ID:       BPST2     S Wichita Rv bl Low Flow Dam nr
STATION TYPE: reregulating structure
Regulating: Stage = 7.01, Flow = 386

PRECIP ELEVATION TW-ELEV STAGE RIV-FLOW WTR-TEMP CONDUCT BAT-LOAD
in ft ft ft cfs F umho/cm volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
11/04 00:00 0.00 1599.93 ---- 4.03 2 66.99 64 13.75
11/04 01:00 0.00 1599.92 ---- 4.21 3 67.03 64 13.72
11/04 02:00 0.00 1599.93 ---- 4.01 2 67.06 64 13.41
11/04 03:00 0.00 1599.93 ---- 4.04 2 66.99 64 13.57
11/04 04:00 0.00 1599.94 ---- 4.04 2 67.03 64 13.74
11/04 05:00 0.00 1599.94 ---- 4.35 4 67.01 64 13.68
11/04 06:00 0.00 1599.96 ---- 4.16 2 67.21 64 13.61
11/04 07:00 0.00 1599.95 ---- 4.20 3 67.05 64 13.62
11/04 08:00 0.00 1599.95 ---- 4.15 2 67.05 64 13.78
11/04 09:00 0.00 1599.93 ---- 4.48 5 67.12 64 13.69
11/04 10:00 0.00 1599.95 ---- 4.54 6 67.28 64 13.70
11/04 11:00 0.00 1599.97 ---- 4.27 3 67.23 64 13.37
11/04 12:00 0.00 1599.97 ---- 4.19 3 67.42 64 13.45
11/04 13:00 0.00 1599.96 ---- 4.13 2 67.60 64 13.55
11/04 14:00 0.00 1599.96 ---- 4.13 2 67.62 64 13.65
11/04 15:00 0.00 1599.95 ---- 4.15 2 67.42 64 13.30
11/04 16:00 0.00 1599.96 ---- 4.10 2 67.55 64 13.30
11/04 17:00 0.00 1599.95 ---- 4.22 3 67.48 64 13.31
11/04 18:00 0.00 1599.96 ---- 4.17 2 67.55 64 13.32
11/04 19:00 0.00 1599.96 ---- 4.18 3 67.53 64 13.36
11/04 20:00 0.00 1599.96 ---- 4.14 2 67.55 64 13.55
11/04 21:00 0.00 1599.96 ---- 4.05 2 67.53 64 13.68
11/04 22:00 0.00 1599.95 ---- 4.22 3 67.53 64 13.65
11/04 23:00 ---- ---- ---- ---- ---- ---- ---- ----
Data processed at Tue 05Nov2024 05:33 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BATE.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
BATE.Elev.Inst.1Hour.0.Ccp-Rev
BATE.Elev-Tailwater.Inst.1Hour.0.Ccp-Rev
BATE.Stage.Inst.1Hour.0.Ccp-Rev
BATE.Flow.Inst.1Hour.0.Ccp-Rev
BATE.Temp-Water.Inst.1Hour.0.Ccp-Rev
BATE.Cond-Water.Inst.1Hour.0.Ccp-Rev
BATE.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.