BKDO2: Broken Bow Lake

                                SHEF ID:       BKDO2     Broken Bow Lake
STATION TYPE: Reservoir
Flood Pool: Bottom = 599.90, Top = 627.50

PRECIP ELEVATION STORAGE TW-ELEV INFLOW RELEASE AIR-TEMP WIND-DIRWIND-SPEED REL-HUMID SOLAR-RAD VOLTAGE BAT-LOAD
in ft ac-ft ft cfs cfs F deg mph % W/m2 volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Rev-Regi Rev-Regi Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
10/27 00:00 0.00 589.33 764752 401.40 0 121 65.50 97.50 0.90 79.71 0.00 13.09 12.81
10/27 01:00 0.00 589.33 764752 401.40 0 121 64.13 69.90 0.50 80.89 0.00 13.09 12.81
10/27 02:00 0.00 589.33 764752 401.40 0 121 62.96 60.70 0.60 82.69 0.00 13.09 12.81
10/27 03:00 0.00 589.32 764629 401.40 0 121 62.42 61.70 0.70 80.60 0.00 13.09 12.81
10/27 04:00 0.00 589.32 764629 401.40 0 121 62.44 32.80 0.70 80.11 0.00 13.09 12.81
10/27 05:00 0.00 589.33 764752 401.40 0 121 62.04 48.50 0.70 79.16 0.00 13.09 12.81
10/27 06:00 0.00 589.32 764629 401.40 0 121 61.65 75.30 0.80 80.07 0.00 13.09 12.81
10/27 07:00 0.00 589.32 764629 401.40 0 121 61.32 11.60 0.40 80.83 0.00 13.09 12.81
10/27 08:00 0.00 589.32 764629 401.40 0 121 60.75 29.20 0.60 81.44 0.00 13.09 12.81
10/27 09:00 0.00 589.32 764629 401.40 0 121 61.14 73.40 0.40 80.80 25.20 13.11 12.81
10/27 10:00 0.00 589.32 764629 401.40 0 121 63.63 166.10 0.70 76.81 110.70 13.13 12.81
10/27 11:00 0.00 589.32 764629 401.40 0 121 64.83 234.10 0.60 74.77 126.00 13.14 12.81
10/27 12:00 0.00 589.32 764629 401.40 0 121 66.11 150.80 0.90 75.72 167.80 13.13 12.81
10/27 13:00 0.00 589.32 764629 401.40 0 121 67.64 226.50 1.10 74.75 281.50 14.03 12.89
10/27 14:00 0.00 589.31 764507 401.40 0 121 70.02 185.20 1.70 71.61 301.20 14.04 12.97
10/27 15:00 0.00 589.32 764629 401.40 0 121 70.56 144.80 0.90 72.42 289.60 13.62 13.05
10/27 16:00 0.00 589.31 764507 401.40 0 121 73.51 163.90 1.00 66.56 401.00 13.58 13.29
10/27 17:00 0.00 589.31 764507 401.40 0 121 75.94 182.90 1.80 62.17 148.80 13.53 13.05
10/27 18:00 0.00 589.30 764385 401.40 0 121 73.49 174.90 2.10 67.91 40.00 13.11 12.97
10/27 19:00 0.00 589.31 764507 401.40 0 121 70.72 140.80 0.40 74.37 2.10 13.09 12.89
10/27 20:00 0.00 589.31 764507 401.40 0 121 67.62 140.60 0.30 81.92 0.00 13.09 12.89
10/27 21:00 0.00 589.30 764385 401.40 0 121 65.35 166.30 0.40 87.67 0.00 13.09 12.89
10/27 22:00 0.00 589.31 764507 401.40 0 121 64.33 146.80 0.30 90.22 0.00 13.09 12.81
10/27 23:00 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
Data processed at Mon 28Oct2024 04:09 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BROK.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
BROK.Elev.Inst.1Hour.0.Ccp-Rev
BROK.Stor.Inst.1Hour.0.Ccp-Rev
BROK.Elev-Tailwater.Inst.1Hour.0.Ccp-Rev
BROK.Flow-Res In.Ave.1Hour.1Hour.Rev-Regi-Computed
BROK.Flow-Res Out.Ave.1Hour.1Hour.Rev-Regi-Flowgroup
BROK.Temp-Air.Inst.1Hour.0.Ccp-Rev
BROK.Dir-Wind.Inst.1Hour.0.Ccp-Rev
BROK.Speed-Wind.Inst.1Hour.0.Ccp-Rev
BROK.%-Humidity.Inst.1Hour.0.Ccp-Rev
BROK.Irrad.Inst.1Hour.0.Ccp-Rev
BROK.Volt-Battery.Inst.1Hour.0.Ccp-Rev
BROK.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.