BGSO2: Deep Fork River, Beggs, Okla

                                
SHEF ID:       BGSO2     Deep Fork near Beggs, OK
STATION TYPE:  
Regulating: Stage =    18.00, Flow =     8600

               PRECIP     STAGE  STAGE(2)  RIV-FLOW  BAT-LOAD
                   in        ft        ft       cfs      volt
              Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev   Ccp-Rev
(US/Central)
08/05 00:00      0.00      1.08      ----       192     11.85
08/05 01:00      0.00      1.06      ----       189     11.82
08/05 02:00      0.00      1.03      ----       183     11.81
08/05 03:00      0.00      1.01      ----       179     11.88
08/05 04:00      0.00      0.98      ----       174     11.85
08/05 05:00      0.00      0.96      ----       170     11.84
08/05 06:00      0.00      0.93      ----       165     11.81
08/05 07:00      0.00      0.91      ----       162     11.73
08/05 08:00      0.00      0.89      ----       158     11.75
08/05 09:00      0.00      0.87      ----       155     11.88
08/05 10:00      0.00      0.85      ----       152     12.00
08/05 11:00      0.00      0.83      ----       149     12.54
08/05 12:00      0.00      0.80      ----       144     12.38
08/05 13:00      0.00      0.78      ----       141     12.83
08/05 14:00      0.01      0.76      ----       138     12.36
08/05 15:00      0.01      0.74      ----       135     12.46
08/05 16:00      0.00      0.72      ----       132     12.32
08/05 17:00      0.00      0.70      ----       129     12.38
08/05 18:00      0.00      0.68      ----       126     12.21
08/05 19:00      0.00      0.66      ----       123     12.18
08/05 20:00      0.00      0.64      ----       120     12.09
08/05 21:00      0.00      0.63      ----       119     11.93
08/05 22:00      0.00      0.61      ----       116     11.85
08/05 23:00      0.00      0.59      ----       113     11.85

                            
Data processed at Sun 06Aug2023 04:32 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BEGG.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
BEGG.Stage.Inst.1Hour.0.Ccp-Rev
BEGG.Stage-Alt.Inst.1Hour.0.Ccp-Rev
BEGG.Flow.Inst.1Hour.0.Ccp-Rev
BEGG.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.