BCDO2: Kiamichi River, Big Cedar

                                SHEF ID:       BCDO2     Kiamichi River near Big Cedar, O
STATION TYPE:
Regulating: Stage = 9.00, Flow = 2068

PRECIP STAGE RIV-FLOW WTR-TEMP BAT-LOAD
in ft cfs F volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
01/30 00:00 ---- 3.74 25 49.28 11.88
01/30 01:00 ---- 4.00 58 49.73 11.87
01/30 02:00 ---- 4.49 144 49.98 11.88
01/30 03:00 ---- 5.70 448 50.32 11.86
01/30 04:00 ---- 7.99 1412 50.49 11.87
01/30 05:00 ---- 10.32 3160 50.43 11.85
01/30 06:00 ---- 12.74 6434 51.04 11.87
01/30 07:00 ---- 14.71 10649 51.58 11.85
01/30 08:00 ---- 15.62 13065 51.82 11.85
01/30 09:00 ---- 15.40 12458 51.94 11.85
01/30 10:00 ---- 14.66 10523 52.07 11.98
01/30 11:00 ---- 14.03 9022 52.20 12.00
01/30 12:00 ---- 12.75 6452 52.36 12.04
01/30 13:00 ---- 11.73 4812 52.48 12.06
01/30 14:00 ---- 10.90 3795 52.59 12.06
01/30 15:00 ---- 10.11 2946 52.68 12.08
01/30 16:00 ---- 9.50 2444 52.74 12.08
01/30 17:00 ---- 9.01 2076 52.77 12.08
01/30 18:00 ---- 8.56 1764 52.84 12.05
01/30 19:00 ---- 8.23 1551 52.83 12.06
01/30 20:00 ---- 7.90 1364 52.72 12.05
01/30 21:00 ---- 7.64 1228 52.57 12.04
01/30 22:00 ---- 7.38 1098 52.39 12.04
01/30 23:00 ---- ---- ---- ---- ----
Data processed at Fri 31Jan2025 05:32 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BCED.Precip-Inc.Total.1Hour.1Hour.Ccp-Rev
BCED.Stage.Inst.1Hour.0.Ccp-Rev
BCED.Flow.Inst.1Hour.0.Ccp-Rev
BCED.Temp-Water.Inst.1Hour.0.Ccp-Rev
BCED.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.