BBRO2: Mountain Fork, Broken Bow Rereg

                                SHEF ID:       BBRO2     Mountain Fork Re-regulation Dam
STATION TYPE:

STAGE RIV-FLOW VOLTAGE BAT-LOAD
ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
06/04 00:00 393.22 1848 13.16 12.24
06/04 01:00 392.66 1577 13.17 12.27
06/04 02:00 392.14 1363 13.17 12.27
06/04 03:00 391.68 1172 13.12 12.27
06/04 04:00 391.27 1016 13.17 12.27
06/04 05:00 390.91 880 13.19 12.22
06/04 06:00 390.58 732 13.17 12.24
06/04 07:00 390.30 626 13.13 12.29
06/04 08:00 390.04 542 13.19 12.28
06/04 09:00 389.82 467 13.16 12.31
06/04 10:00 389.61 403 13.17 12.31
06/04 11:00 389.43 356 13.19 12.29
06/04 12:00 389.28 320 13.17 12.28
06/04 13:00 389.13 288 13.19 12.29
06/04 14:00 389.00 263 13.19 12.26
06/04 15:00 388.88 242 13.17 12.29
06/04 16:00 389.24 311 13.17 12.29
06/04 17:00 391.92 1274 13.19 12.36
06/04 18:00 393.97 2290 13.16 12.31
06/04 19:00 395.55 3143 13.19 12.30
06/04 20:00 395.78 3274 13.19 12.26
06/04 21:00 394.99 2844 13.19 12.26
06/04 22:00 394.24 2430 13.19 12.27
06/04 23:00 393.56 2037 13.17 12.31
Data processed at Thu 05Jun2025 04:34 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BROM.Stage.Inst.1Hour.0.Ccp-Rev
BROM.Flow.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.