BBRO2: Mountain Fork, Broken Bow Rereg

                                SHEF ID:       BBRO2     Mountain Fork Re-regulation Dam
STATION TYPE:

STAGE RIV-FLOW VOLTAGE BAT-LOAD
ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
04/21 00:00 392.78 1631 13.19 12.55
04/21 01:00 392.15 1366 13.18 12.57
04/21 02:00 391.58 1132 13.19 12.56
04/21 03:00 391.07 948 13.19 12.56
04/21 04:00 390.62 749 13.06 12.57
04/21 05:00 390.21 596 13.19 12.56
04/21 06:00 389.86 481 13.05 12.57
04/21 07:00 389.81 464 13.17 12.57
04/21 08:00 390.72 792 13.16 12.56
04/21 09:00 391.52 1109 13.21 12.54
04/21 10:00 392.16 1370 13.19 12.52
04/21 11:00 392.69 1590 13.21 12.50
04/21 12:00 393.13 1801 13.20 12.47
04/21 13:00 393.51 2008 13.20 12.47
04/21 14:00 393.83 2200 13.19 12.47
04/21 15:00 394.11 2364 13.17 12.46
04/21 16:00 394.36 2492 13.17 12.48
04/21 17:00 394.58 2609 13.19 12.50
04/21 18:00 394.78 2721 13.19 12.50
04/21 19:00 395.55 3143 13.19 12.50
04/21 20:00 396.69 3713 13.19 12.52
04/21 21:00 397.56 4060 13.17 12.53
04/21 22:00 397.87 4176 13.19 12.53
04/21 23:00 397.96 4210 13.09 12.54
Data processed at Tue 22Apr2025 04:34 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BROM.Stage.Inst.1Hour.0.Ccp-Rev
BROM.Flow.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.