BBRO2: Mountain Fork, Broken Bow Rereg

                                SHEF ID:       BBRO2     Mountain Fork Re-regulation Dam
STATION TYPE:

STAGE RIV-FLOW VOLTAGE BAT-LOAD
ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
10/07 00:00 390.53 712 13.13 12.40
10/07 01:00 390.19 589 13.18 12.38
10/07 02:00 389.90 494 13.17 12.38
10/07 03:00 389.63 409 13.18 12.40
10/07 04:00 389.39 346 13.18 12.38
10/07 05:00 389.18 298 13.19 12.40
10/07 06:00 388.99 261 13.17 12.40
10/07 07:00 388.81 230 13.17 12.40
10/07 08:00 388.66 207 13.17 12.44
10/07 09:00 388.52 188 13.18 12.42
10/07 10:00 388.39 171 13.19 12.41
10/07 11:00 388.28 159 13.17 12.44
10/07 12:00 388.17 147 13.18 12.47
10/07 13:00 388.08 138 13.19 12.47
10/07 14:00 388.00 130 13.21 12.46
10/07 15:00 387.92 123 13.19 12.46
10/07 16:00 387.84 116 13.20 12.47
10/07 17:00 387.84 116 13.18 12.47
10/07 18:00 389.16 294 13.20 12.48
10/07 19:00 390.45 681 13.19 12.50
10/07 20:00 391.10 958 13.13 12.49
10/07 21:00 390.82 837 13.20 12.50
10/07 22:00 390.47 689 13.19 12.51
10/07 23:00 ---- ---- ---- ----
Data processed at Tue 08Oct2024 04:34 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BROM.Stage.Inst.1Hour.0.Ccp-Rev
BROM.Flow.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.