BBRO2: Mountain Fork, Broken Bow Rereg

                                SHEF ID:       BBRO2     Mountain Fork Re-regulation Dam
STATION TYPE:

STAGE RIV-FLOW VOLTAGE BAT-LOAD
ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/25 00:00 389.65 415 13.19 12.33
09/25 01:00 389.42 353 13.12 12.32
09/25 02:00 389.20 303 13.18 12.37
09/25 03:00 389.02 267 13.18 12.36
09/25 04:00 388.86 238 13.17 12.37
09/25 05:00 388.73 218 13.17 12.36
09/25 06:00 388.59 197 13.18 12.37
09/25 07:00 388.47 181 13.12 12.37
09/25 08:00 388.35 167 13.19 12.37
09/25 09:00 388.25 155 13.12 12.38
09/25 10:00 388.15 145 13.16 12.37
09/25 11:00 388.06 136 13.17 12.37
09/25 12:00 387.97 128 13.17 12.35
09/25 13:00 387.89 121 13.16 12.35
09/25 14:00 387.82 115 13.18 12.34
09/25 15:00 387.76 110 13.12 12.34
09/25 16:00 387.78 112 13.18 12.28
09/25 17:00 389.20 303 13.18 12.33
09/25 18:00 390.34 641 13.19 12.34
09/25 19:00 390.35 644 13.18 12.37
09/25 20:00 390.23 603 13.19 12.37
09/25 21:00 390.06 548 13.18 12.37
09/25 22:00 389.86 481 13.16 12.41
09/25 23:00 ---- ---- ---- ----
Data processed at Thu 26Sep2024 04:34 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BROM.Stage.Inst.1Hour.0.Ccp-Rev
BROM.Flow.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.