BBRO2: Mountain Fork, Broken Bow Rereg

                                SHEF ID:       BBRO2     Mountain Fork Re-regulation Dam
STATION TYPE:

STAGE RIV-FLOW VOLTAGE BAT-LOAD
ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
08/07 00:00 395.24 2974 13.19 12.50
08/07 01:00 394.51 2571 13.21 12.50
08/07 02:00 393.86 2219 13.12 12.50
08/07 03:00 393.29 1885 13.19 12.51
08/07 04:00 392.77 1627 13.20 12.51
08/07 05:00 392.31 1429 13.19 12.53
08/07 06:00 391.89 1261 13.19 12.52
08/07 07:00 391.53 1112 13.20 12.51
08/07 08:00 391.20 992 13.20 12.51
08/07 09:00 390.92 885 13.17 12.50
08/07 10:00 390.66 766 13.22 12.48
08/07 11:00 390.44 677 13.20 12.47
08/07 12:00 390.24 606 13.22 12.47
08/07 13:00 390.06 548 13.20 12.48
08/07 14:00 389.89 491 13.13 12.47
08/07 15:00 390.29 623 13.19 12.48
08/07 16:00 392.93 1701 13.21 12.48
08/07 17:00 394.96 2826 13.22 12.50
08/07 18:00 396.53 3639 13.22 12.50
08/07 19:00 397.85 4168 13.21 12.50
08/07 20:00 397.81 4153 13.17 12.53
08/07 21:00 396.93 3826 13.19 12.52
08/07 22:00 396.09 3444 13.06 12.53
08/07 23:00 ---- ---- ---- ----
Data processed at Thu 08Aug2024 04:34 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BROM.Stage.Inst.1Hour.0.Ccp-Rev
BROM.Flow.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.