BBRO2: Mountain Fork, Broken Bow Rereg

                                SHEF ID:       BBRO2     Mountain Fork Re-regulation Dam
STATION TYPE:

STAGE RIV-FLOW VOLTAGE BAT-LOAD
ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
08/03 00:00 394.45 2539 13.20 12.48
08/03 01:00 393.80 2182 13.19 12.47
08/03 02:00 393.22 1848 13.20 12.48
08/03 03:00 392.70 1595 13.17 12.47
08/03 04:00 392.22 1394 13.17 12.48
08/03 05:00 391.84 1239 13.19 12.48
08/03 06:00 391.46 1086 13.19 12.48
08/03 07:00 391.12 964 13.18 12.48
08/03 08:00 390.84 846 13.19 12.48
08/03 09:00 390.58 732 13.20 12.47
08/03 10:00 390.35 644 13.20 12.45
08/03 11:00 390.14 573 13.20 12.42
08/03 12:00 389.96 515 13.21 12.42
08/03 13:00 389.80 461 13.20 12.40
08/03 14:00 389.67 421 13.22 12.41
08/03 15:00 389.67 421 13.20 12.41
08/03 16:00 390.88 865 13.19 12.42
08/03 17:00 391.99 1305 13.19 12.42
08/03 18:00 392.52 1516 13.21 12.43
08/03 19:00 392.20 1386 13.19 12.44
08/03 20:00 391.89 1261 13.20 12.44
08/03 21:00 391.46 1086 13.20 12.45
08/03 22:00 391.14 971 13.19 12.46
08/03 23:00 ---- ---- ---- ----
Data processed at Sun 04Aug2024 04:34 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BROM.Stage.Inst.1Hour.0.Ccp-Rev
BROM.Flow.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.