BBRO2: Mountain Fork, Broken Bow Rereg

                                SHEF ID:       BBRO2     Mountain Fork Re-regulation Dam
STATION TYPE:

STAGE RIV-FLOW VOLTAGE BAT-LOAD
ft cfs volt volt
Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev
(America/Chicago)
09/07 00:00 388.22 152 13.23 12.91
09/07 01:00 388.17 147 13.22 12.90
09/07 02:00 388.13 143 13.22 12.91
09/07 03:00 388.09 139 13.22 12.91
09/07 04:00 388.04 134 13.22 12.90
09/07 05:00 388.01 131 13.22 12.91
09/07 06:00 387.97 128 13.23 12.91
09/07 07:00 387.93 124 13.22 12.91
09/07 08:00 387.90 121 13.23 12.92
09/07 09:00 387.86 118 13.22 12.90
09/07 10:00 387.83 116 13.23 12.90
09/07 11:00 387.80 113 13.23 12.90
09/07 12:00 387.77 111 13.22 12.90
09/07 13:00 387.74 109 13.23 12.89
09/07 14:00 387.72 107 13.23 12.88
09/07 15:00 387.69 105 13.22 12.89
09/07 16:00 387.67 103 13.24 12.88
09/07 17:00 387.65 102 13.11 12.88
09/07 18:00 387.63 100 13.23 12.88
09/07 19:00 387.61 99 13.22 12.88
09/07 20:00 387.59 98 13.22 12.89
09/07 21:00 387.57 96 13.22 12.88
09/07 22:00 387.55 95 13.22 12.88
09/07 23:00 387.53 93 13.23 12.89
Data processed at Fri 08Sep2023 04:43 GMT

Parsing this webpage?

Checkout our new Data API! CWMSDataAPI (CDA)

Timeseries IDs (TSIDs)

TSIDs used from left to right in the data table
BROM.Stage.Inst.1Hour.0.Ccp-Rev
BROM.Flow.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery.Inst.1Hour.0.Ccp-Rev
BROM.Volt-Battery Load.Inst.1Hour.0.Ccp-Rev

                            

All information presented herein is the property of the government of the United States of America and may be revised or deleted at any time without prior notice. Dissemination of this information without the expressed written consent of the Public Affairs Office, Tulsa District U.S. Army Corps of Engineers is strictly prohibited. These data are gathered electronically and, as presented, have NOT undergone any form of quality control. These data are NOT guaranteed to be valid or correct.