Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/06 00:00 0.00 391.68 371.77 13.10 09/06 01:00 0.00 391.71 371.81 13.00 09/06 02:00 0.00 391.54 371.34 13.10 09/06 03:00 0.00 391.60 366.57 13.00 09/06 04:00 0.00 391.75 371.86 13.50 09/06 05:00 0.00 391.63 371.88 13.00 09/06 06:00 0.00 391.55 371.67 13.60 09/06 07:00 0.00 391.64 371.61 13.20 09/06 08:00 0.00 391.66 371.62 13.00 09/06 09:00 0.00 391.59 371.76 13.40 09/06 10:00 0.00 391.58 371.82 13.10 09/06 11:00 0.00 391.64 371.67 13.10 09/06 12:00 0.00 391.63 371.62 13.30 09/06 13:00 0.00 391.59 371.67 13.10 09/06 14:00 0.00 391.47 372.07 13.00 09/06 15:00 0.00 391.58 372.26 13.00 09/06 16:00 0.00 391.63 372.80 13.20 09/06 17:00 0.00 391.47 372.50 13.60 09/06 18:00 0.00 391.53 372.37 13.00 09/06 19:00 0.00 391.57 372.30 13.10 09/06 20:00 0.00 391.65 371.86 13.60 09/06 21:00 0.00 391.87 371.83 13.30 09/06 22:00 0.00 392.04 371.34 13.40 09/06 23:00 0.00 391.83 371.54 13.00