Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 09/04 00:00 0.00 391.51 371.69 13.20 09/04 01:00 0.00 391.45 371.67 13.30 09/04 02:00 0.00 391.52 371.75 13.10 09/04 03:00 0.00 391.58 371.86 13.70 09/04 04:00 0.00 391.47 371.88 13.70 09/04 05:00 0.00 391.49 371.69 13.70 09/04 06:00 0.00 391.54 371.70 13.10 09/04 07:00 0.00 391.54 371.81 13.30 09/04 08:00 0.00 391.48 371.81 13.10 09/04 09:00 0.00 391.52 371.79 13.70 09/04 10:00 0.00 391.53 371.71 13.30 09/04 11:00 0.00 391.52 371.72 13.20 09/04 12:00 0.00 391.49 371.81 13.20 09/04 13:00 0.00 391.54 371.79 13.00 09/04 14:00 0.00 391.52 371.41 13.00 09/04 15:00 0.00 391.34 371.79 13.30 09/04 16:00 0.00 391.55 372.19 13.00 09/04 17:00 0.00 391.76 372.43 12.90 09/04 18:00 0.00 391.73 372.31 13.00 09/04 19:00 0.00 391.87 371.88 13.00 09/04 20:00 0.00 391.81 371.75 13.40 09/04 21:00 0.00 391.65 371.80 13.10 09/04 22:00 0.00 391.66 371.97 13.70 09/04 23:00 0.00 391.74 371.92 13.00