Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/24 00:00 0.00 391.42 370.98 13.80 08/24 01:00 0.00 391.42 371.23 13.10 08/24 02:00 0.00 391.40 371.43 13.40 08/24 03:00 0.00 391.32 371.46 13.40 08/24 04:00 0.00 391.29 371.39 13.50 08/24 05:00 0.00 391.27 371.47 13.10 08/24 06:00 0.00 391.23 371.67 13.20 08/24 07:00 0.00 391.25 371.60 13.10 08/24 08:00 0.00 391.25 371.54 13.60 08/24 09:00 0.00 391.29 371.59 13.40 08/24 10:00 0.00 391.32 371.40 13.20 08/24 11:00 0.00 391.36 371.94 13.10 08/24 12:00 0.00 391.44 371.75 13.10 08/24 13:00 0.00 391.52 371.75 13.20 08/24 14:00 0.00 391.66 371.90 13.70 08/24 15:00 0.00 391.73 372.67 13.60 08/24 16:00 0.00 391.70 372.97 13.30 08/24 17:00 0.00 391.67 372.81 13.70 08/24 18:00 0.00 391.66 372.48 13.70 08/24 19:00 0.00 391.75 371.62 13.30 08/24 20:00 0.00 391.67 371.15 13.60 08/24 21:00 0.00 391.72 370.40 13.10 08/24 22:00 0.00 391.79 371.29 13.10 08/24 23:00 0.00 391.66 371.64 13.20