Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/20 00:00 0.00 391.62 371.32 13.00 08/20 01:00 0.00 391.40 371.56 13.60 08/20 02:00 0.00 391.47 371.50 13.00 08/20 03:00 0.00 391.57 371.54 13.20 08/20 04:00 0.00 391.51 371.38 13.00 08/20 05:00 0.00 391.46 371.37 13.10 08/20 06:00 0.00 391.52 371.55 13.00 08/20 07:00 0.00 391.54 371.53 13.10 08/20 08:00 0.00 391.47 371.44 13.00 08/20 09:00 0.00 391.51 371.42 13.10 08/20 10:00 0.00 391.57 371.40 13.00 08/20 11:00 0.00 391.52 371.50 13.10 08/20 12:00 0.00 391.69 371.50 13.10 08/20 13:00 0.00 391.71 371.80 13.20 08/20 14:00 0.00 391.70 371.75 13.60 08/20 15:00 0.00 391.65 371.61 12.90 08/20 16:00 0.00 391.66 371.70 13.00 08/20 17:00 0.00 391.67 371.55 12.90 08/20 18:00 0.00 391.67 371.38 13.70 08/20 19:00 0.00 391.77 370.61 13.40 08/20 20:00 0.00 391.83 371.33 12.90 08/20 21:00 0.00 391.64 371.71 13.20 08/20 22:00 0.00 391.62 371.35 12.90 08/20 23:00 0.00 391.77 371.42 13.00