Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/11 00:00 0.00 391.75 371.06 13.20 08/11 01:00 0.00 391.98 370.47 13.30 08/11 02:00 0.00 391.58 370.64 13.30 08/11 03:00 0.00 391.55 370.95 13.20 08/11 04:00 0.00 391.78 371.02 13.00 08/11 05:00 0.00 391.72 370.82 13.20 08/11 06:00 0.00 391.62 370.61 13.30 08/11 07:00 0.00 391.68 370.69 13.20 08/11 08:00 0.00 391.78 370.98 13.20 08/11 09:00 0.00 391.65 370.92 13.40 08/11 10:00 0.00 391.56 370.77 13.20 08/11 11:00 0.00 391.97 371.54 13.10 08/11 12:00 0.00 391.91 371.64 13.30 08/11 13:00 0.00 391.87 371.76 13.20 08/11 14:00 0.00 391.86 371.71 13.10 08/11 15:00 0.00 391.87 371.80 13.50 08/11 16:00 0.00 391.84 371.69 13.20 08/11 17:00 0.00 391.83 371.58 13.10 08/11 18:00 0.00 391.82 371.50 13.20 08/11 19:00 0.00 391.81 371.45 13.20 08/11 20:00 0.00 391.79 371.40 13.70 08/11 21:00 0.00 391.77 371.37 13.10 08/11 22:00 0.00 391.75 371.68 13.30 08/11 23:00 0.00 391.76 371.93 13.20