Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 08/06 00:00 0.00 391.73 371.52 13.20 08/06 01:00 0.00 391.74 371.61 12.80 08/06 02:00 0.00 391.74 371.74 13.10 08/06 03:00 0.00 391.74 371.92 13.40 08/06 04:00 0.00 391.67 372.46 13.00 08/06 05:00 0.00 391.66 372.86 13.00 08/06 06:00 0.00 391.58 373.02 13.00 08/06 07:00 0.00 391.53 373.14 13.00 08/06 08:00 0.00 391.50 373.03 12.90 08/06 09:00 0.00 391.57 372.50 12.90 08/06 10:00 0.00 391.74 371.75 13.30 08/06 11:00 0.00 391.85 371.39 13.00 08/06 12:00 0.00 391.34 371.41 13.50 08/06 13:00 0.00 391.51 371.44 13.00 08/06 14:00 0.00 391.67 371.11 13.20 08/06 15:00 0.00 391.53 371.04 12.90 08/06 16:00 0.00 391.63 371.10 13.20 08/06 17:00 0.00 391.73 371.45 12.90 08/06 18:00 0.00 391.67 371.69 13.00 08/06 19:00 0.00 391.73 371.49 13.00 08/06 20:00 0.00 391.60 371.30 13.00 08/06 21:00 0.00 391.51 371.03 12.90 08/06 22:00 0.00 391.50 371.27 13.40 08/06 23:00 0.00 391.55 371.18 13.00