Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 07/26 00:00 0.00 391.41 371.06 13.10 07/26 01:00 0.00 391.10 371.45 13.30 07/26 02:00 0.00 391.16 371.78 13.20 07/26 03:00 0.00 391.20 371.68 13.10 07/26 04:00 0.00 391.25 371.30 13.50 07/26 05:00 0.00 391.11 371.21 13.20 07/26 06:00 0.00 391.18 371.17 13.20 07/26 07:00 0.00 391.18 371.56 13.10 07/26 08:00 0.00 391.16 371.38 13.10 07/26 09:00 0.00 391.15 371.36 13.40 07/26 10:00 0.00 391.22 371.38 13.00 07/26 11:00 0.00 391.21 371.49 13.30 07/26 12:00 0.00 391.18 371.58 13.30 07/26 13:00 0.00 391.31 371.55 13.00 07/26 14:00 0.00 391.61 371.82 13.30 07/26 15:00 0.00 391.58 372.20 13.40 07/26 16:00 0.00 391.64 371.79 13.20 07/26 17:00 0.00 391.70 371.52 13.20 07/26 18:00 0.00 391.68 371.28 13.10 07/26 19:00 0.00 391.65 371.20 12.90 07/26 20:00 0.00 391.69 371.14 13.00 07/26 21:00 0.00 391.68 371.33 13.10 07/26 22:00 0.00 391.64 371.56 13.10 07/26 23:00 0.00 391.63 371.53 13.20