Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 07/21 00:00 0.00 391.39 371.13 13.10 07/21 01:00 0.00 391.48 371.53 13.00 07/21 02:00 0.00 391.70 371.66 13.40 07/21 03:00 0.00 391.57 371.28 13.20 07/21 04:00 0.00 391.48 371.06 13.40 07/21 05:00 0.00 391.61 371.26 13.40 07/21 06:00 0.00 391.63 371.46 13.20 07/21 07:00 0.00 391.51 371.50 13.10 07/21 08:00 0.00 391.63 370.94 13.00 07/21 09:00 0.00 391.84 372.17 13.30 07/21 10:00 0.00 391.74 372.22 13.10 07/21 11:00 0.00 391.65 372.44 13.20 07/21 12:00 0.00 391.62 372.51 13.50 07/21 13:00 0.00 391.56 372.58 13.30 07/21 14:00 0.00 391.52 372.81 13.40 07/21 15:00 0.00 391.43 372.95 13.70 07/21 16:00 0.00 391.39 372.62 13.40 07/21 17:00 0.00 391.27 372.21 13.50 07/21 18:00 0.02 391.52 371.77 13.10 07/21 19:00 0.00 391.42 371.52 13.20 07/21 20:00 0.01 391.59 370.83 13.70 07/21 21:00 0.03 391.71 370.51 13.00 07/21 22:00 0.02 391.73 371.24 13.10 07/21 23:00 0.00 391.69 372.28 12.90