Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 07/19 00:00 0.00 391.80 371.25 13.30 07/19 01:00 0.00 391.89 371.53 13.20 07/19 02:00 0.00 391.90 371.74 13.50 07/19 03:00 0.00 391.94 371.55 13.30 07/19 04:00 0.00 391.76 371.73 13.60 07/19 05:00 0.00 391.75 371.85 13.10 07/19 06:00 0.00 391.76 371.83 13.10 07/19 07:00 0.00 391.81 371.76 13.10 07/19 08:00 0.00 391.80 371.91 13.20 07/19 09:00 0.00 391.68 371.91 13.70 07/19 10:00 0.00 391.71 372.15 13.50 07/19 11:00 0.00 391.89 372.23 13.40 07/19 12:00 0.00 391.82 372.60 13.40 07/19 13:00 0.00 391.85 372.64 13.10 07/19 14:00 0.00 391.90 372.71 13.10 07/19 15:00 0.00 391.92 372.78 13.00 07/19 16:00 0.00 391.91 372.50 13.60 07/19 17:00 0.00 391.94 372.38 13.20 07/19 18:00 0.00 391.94 372.22 13.30 07/19 19:00 0.00 391.94 371.94 13.50 07/19 20:00 0.00 391.95 371.89 13.20 07/19 21:00 0.00 391.94 371.86 13.50 07/19 22:00 0.00 391.95 372.27 12.90 07/19 23:00 0.00 391.94 372.56 13.20