Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 07/13 00:00 0.00 391.75 371.69 13.70 07/13 01:00 0.00 391.59 371.76 13.30 07/13 02:00 0.00 391.73 371.85 13.10 07/13 03:00 0.00 391.70 371.63 13.70 07/13 04:00 0.00 391.54 371.56 13.20 07/13 05:00 0.00 391.65 371.14 13.20 07/13 06:00 0.00 391.74 371.23 13.70 07/13 07:00 0.00 391.48 371.42 13.10 07/13 08:00 0.00 391.50 371.43 13.20 07/13 09:00 0.00 391.70 371.54 13.70 07/13 10:00 0.00 391.61 371.44 13.10 07/13 11:00 0.00 391.50 371.26 13.10 07/13 12:00 0.00 392.04 371.39 13.60 07/13 13:00 0.00 391.94 372.25 13.10 07/13 14:00 0.00 391.90 372.31 13.30 07/13 15:00 0.00 391.89 372.12 13.10 07/13 16:00 0.00 391.93 371.96 13.30 07/13 17:00 0.00 391.86 371.66 13.00 07/13 18:00 0.00 391.87 371.34 13.00 07/13 19:00 0.00 391.89 371.16 13.30 07/13 20:00 0.00 391.91 370.96 13.60 07/13 21:00 0.00 391.95 371.08 13.30 07/13 22:00 0.00 391.92 371.32 12.90 07/13 23:00 0.00 391.91 371.74 13.00