Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 06/29 00:00 0.00 391.52 374.61 13.40 06/29 01:00 0.00 391.48 374.41 13.20 06/29 02:00 0.00 391.41 374.41 13.30 06/29 03:00 0.00 391.35 374.33 13.60 06/29 04:00 0.00 391.32 374.34 13.30 06/29 05:00 0.00 391.24 374.37 13.10 06/29 06:00 0.00 391.20 374.36 13.70 06/29 07:00 0.00 391.25 374.13 13.80 06/29 08:00 0.00 391.31 373.91 13.40 06/29 09:00 0.00 391.36 373.76 13.40 06/29 10:00 0.00 391.38 373.67 13.20 06/29 11:00 0.00 391.47 373.71 13.40 06/29 12:00 0.00 391.46 373.76 13.30 06/29 13:00 0.00 391.44 373.87 13.30 06/29 14:00 0.00 391.45 373.96 13.30 06/29 15:00 0.00 391.45 373.92 13.60 06/29 16:00 0.00 391.47 373.79 13.70 06/29 17:00 0.00 391.46 373.74 13.60 06/29 18:00 0.00 391.47 373.62 13.60 06/29 19:00 0.00 391.48 373.56 13.80 06/29 20:00 0.00 391.55 373.43 13.20 06/29 21:00 0.00 391.59 373.35 13.60 06/29 22:00 0.00 391.66 373.25 13.20 06/29 23:00 0.00 391.68 373.16 13.10