Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 06/22 00:00 0.00 391.52 377.11 13.40 06/22 01:00 0.00 391.59 377.21 13.40 06/22 02:00 0.00 391.50 377.22 13.40 06/22 03:00 0.00 391.55 377.11 13.40 06/22 04:00 0.00 391.44 377.30 13.40 06/22 05:00 0.00 391.52 377.40 13.40 06/22 06:00 0.00 391.50 377.42 13.40 06/22 07:00 0.00 391.46 377.46 13.40 06/22 08:00 0.00 391.47 377.25 13.50 06/22 09:00 0.00 391.42 377.39 13.40 06/22 10:00 0.00 391.46 377.35 13.40 06/22 11:00 0.00 391.44 377.33 13.70 06/22 12:00 0.00 391.43 377.27 13.30 06/22 13:00 0.00 391.40 377.25 13.40 06/22 14:00 0.00 391.39 377.28 13.50 06/22 15:00 0.00 391.35 377.27 13.30 06/22 16:00 0.00 391.31 377.28 13.30 06/22 17:00 0.00 391.28 377.26 13.30 06/22 18:00 0.00 391.23 377.25 13.30 06/22 19:00 0.00 391.23 377.16 13.50 06/22 20:00 0.00 391.22 377.10 13.30 06/22 21:00 0.00 391.25 377.04 13.40 06/22 22:00 0.00 391.25 376.97 13.80 06/22 23:00 0.00 391.27 376.96 13.40