Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 05/05 00:00 0.00 391.24 377.91 13.40 05/05 01:00 0.01 391.12 378.40 13.30 05/05 02:00 0.00 390.79 379.15 13.10 05/05 03:00 0.00 390.71 379.56 13.10 05/05 04:00 0.41 390.53 380.38 13.00 05/05 05:00 0.14 390.37 381.04 13.80 05/05 06:00 0.08 390.14 381.71 13.40 05/05 07:00 0.00 389.93 382.55 13.10 05/05 08:00 0.02 389.92 383.23 13.10 05/05 09:00 0.08 389.43 384.66 13.10 05/05 10:00 0.05 389.37 385.67 13.00 05/05 11:00 0.00 389.30 386.54 13.20 05/05 12:00 0.00 389.40 387.46 13.70 05/05 13:00 0.00 389.47 388.31 13.10 05/05 14:00 0.00 389.77 388.80 13.70 05/05 15:00 0.00 390.37 389.36 13.50 05/05 16:00 0.32 390.94 389.83 13.00 05/05 17:00 0.01 391.46 390.30 13.00 05/05 18:00 0.00 391.79 390.67 13.00 05/05 19:00 0.00 392.23 391.01 13.20 05/05 20:00 0.00 392.50 391.35 13.20 05/05 21:00 0.01 392.93 391.65 13.20 05/05 22:00 0.07 393.19 391.99 13.70 05/05 23:00 0.05 393.55 392.27 13.10