Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 04/15 00:00 0.00 391.67 374.88 13.40 04/15 01:00 0.00 391.68 374.88 13.00 04/15 02:00 0.00 391.59 374.88 13.30 04/15 03:00 0.00 391.53 374.86 13.40 04/15 04:00 0.00 391.55 374.58 13.00 04/15 05:00 0.00 391.58 374.45 13.10 04/15 06:00 0.00 391.50 374.42 13.00 04/15 07:00 0.00 391.58 374.47 13.70 04/15 08:00 0.00 391.58 374.50 13.50 04/15 09:00 0.00 391.58 374.55 13.00 04/15 10:00 0.00 391.56 374.53 13.70 04/15 11:00 0.00 391.55 374.49 13.70 04/15 12:00 0.00 391.50 374.47 13.10 04/15 13:00 0.00 391.41 374.42 13.70 04/15 14:00 0.00 391.35 374.35 13.00 04/15 15:00 0.00 391.34 373.96 13.00 04/15 16:00 0.00 391.45 373.84 13.50 04/15 17:00 0.00 391.45 373.70 13.10 04/15 18:00 0.00 391.49 373.66 13.10 04/15 19:00 0.00 391.57 373.65 13.70 04/15 20:00 0.00 391.60 374.08 13.00 04/15 21:00 0.00 391.63 374.26 13.00 04/15 22:00 0.00 391.69 374.39 13.10 04/15 23:00 0.00 391.58 375.19 13.60