Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 04/12 00:00 0.00 391.50 376.45 13.20 04/12 01:00 0.00 391.54 376.37 12.90 04/12 02:00 0.00 391.57 376.32 12.80 04/12 03:00 0.00 391.56 376.29 12.80 04/12 04:00 0.00 391.54 376.44 13.10 04/12 05:00 0.00 391.52 376.48 12.80 04/12 06:00 0.00 391.49 376.51 13.30 04/12 07:00 0.00 391.51 376.27 12.70 04/12 08:00 0.00 391.49 376.40 13.50 04/12 09:00 0.00 391.48 376.34 12.70 04/12 10:00 0.00 391.51 376.27 13.30 04/12 11:00 0.00 391.47 376.31 13.40 04/12 12:00 0.00 391.49 376.26 12.70 04/12 13:00 0.00 391.46 376.34 13.00 04/12 14:00 0.00 391.46 376.27 13.40 04/12 15:00 0.00 391.46 376.29 13.00 04/12 16:00 0.00 391.43 376.25 13.30 04/12 17:00 0.00 391.42 376.10 13.00 04/12 18:00 0.00 391.41 376.28 12.60 04/12 19:00 0.00 391.38 376.25 12.60 04/12 20:00 0.00 391.38 376.22 12.60 04/12 21:00 0.00 391.36 376.23 13.10 04/12 22:00 0.00 391.35 376.20 12.70 04/12 23:00 0.00 391.35 376.26 12.60