Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 04/05 00:00 0.14 391.46 376.26 13.90 04/05 01:00 0.29 391.45 376.28 13.10 04/05 02:00 0.08 391.46 376.11 13.20 04/05 03:00 0.00 391.58 376.01 13.80 04/05 04:00 0.00 391.64 376.00 13.20 04/05 05:00 0.00 391.72 375.94 13.30 04/05 06:00 0.00 391.86 375.90 13.20 04/05 07:00 0.00 391.88 376.24 13.70 04/05 08:00 0.00 391.59 377.30 13.40 04/05 09:00 0.00 391.66 377.76 13.20 04/05 10:00 0.00 391.71 377.95 13.40 04/05 11:00 0.00 391.41 379.10 13.90 04/05 12:00 0.00 391.31 379.66 13.20 04/05 13:00 0.00 391.22 379.91 13.90 04/05 14:00 0.00 391.19 380.32 13.20 04/05 15:00 0.00 391.19 380.47 13.20 04/05 16:00 0.00 391.22 380.56 13.20 04/05 17:00 0.00 391.27 380.67 13.10 04/05 18:00 0.00 391.31 380.73 13.80 04/05 19:00 0.00 391.37 380.77 13.30 04/05 20:00 0.00 391.42 380.83 13.40 04/05 21:00 0.00 391.42 380.85 13.30 04/05 22:00 0.00 391.36 380.83 13.70 04/05 23:00 0.00 391.31 380.86 13.80