Upstream stations:
SHEF ID: BARA4 AR River at James W. Trimble L&D STATION TYPE: PRECIP ELEVATION TW-ELEV VOLTAGE in ft ft volt Ccp-Rev Ccp-Rev Ccp-Rev Ccp-Rev (US/Central) 03/28 00:00 0.00 391.31 376.20 13.90 03/28 01:00 0.00 391.31 376.24 13.70 03/28 02:00 0.00 391.30 376.27 13.60 03/28 03:00 0.00 391.29 376.27 13.20 03/28 04:00 0.00 391.28 376.25 13.70 03/28 05:00 0.00 391.29 376.27 13.60 03/28 06:00 0.00 391.28 376.29 13.80 03/28 07:00 0.00 391.30 376.21 13.10 03/28 08:00 0.00 391.31 376.18 13.20 03/28 09:00 0.00 391.47 375.89 13.50 03/28 10:00 0.00 391.55 375.82 13.40 03/28 11:00 0.00 391.59 375.76 13.50 03/28 12:00 0.00 391.57 375.68 13.80 03/28 13:00 0.00 391.57 375.65 13.50 03/28 14:00 0.00 391.56 375.59 13.20 03/28 15:00 0.00 391.57 375.54 13.60 03/28 16:00 0.00 391.46 375.75 13.30 03/28 17:00 0.00 391.37 375.90 13.20 03/28 18:00 0.00 391.33 376.02 13.60 03/28 19:00 0.00 391.28 376.13 13.20 03/28 20:00 0.00 391.31 376.00 13.10 03/28 21:00 0.00 391.32 375.94 13.70 03/28 22:00 0.00 391.33 375.89 13.30 03/28 23:00 0.00 391.36 375.90 13.20